Changelog
Mission Support ships in phases, and each one has to run a real event before the next begins. This is where they get written down.
- 2026-07-12
Tenant isolation hardened
shippedRole escalation closed, the audit trail is now write-only from the server, and event-manager scoping is enforced down to the row. The RLS suite grew from five assertions to a full role × operation matrix that runs before every deploy.
- 2026-05-03
Phase 1 — schema and row-level security
shippedTenants, branding, logos, domains, members, events, days and ticket options. Every tenant-scoped table forces row-level security; a Postgres hook puts the tenant context into the access token at sign-in.
- 2026-05-02
Phase 0 — design foundation
shippedThe type scale, colour tokens, motion specs and the first reference components. The marketing site is the proof that the system holds up before a single product screen exists.
- Next
Registration, tickets and check-in
buildingThe path to a real event running end to end: a registration form, confirmation and ticket mail, a QR ticket, and a scanner that works one-handed in bright sun. Everything else waits behind it.
Want in on an early phase? Request early access